Remodel Office Space [Current Project]

Remove and Erect interior walls, Replace all flooring, Update and Replace all Bathroom fixtures, Replace and Update Ceiling Light Fixtures, Replace and Update Faulty Electrical Panel, Install Emergency Exit Signs, and Paint Entire Space

Add 2 Full Baths and Complete Room Over Garage

In room over the garage: frame-out and build a bathroom with tiled shower, frame-out pony wall around stairwell, finish drywall, install trim around windows, doors and baseboard, paint walls and trim and install luxury vinyl plank flooring. Construct a full bathroom with tiled shower and floor in downstairs large utility room.

Master Bathroom Remodel

Gut entire bathroom, build large tiled shower, relocate toilet, install and plumb new vanity, install vanity lights, paint room, move and enlarge pocket door and tile floor